06 80 35 31 84
DPE d’OC — Property inspections Call Free quote

Which property assessments do you need for your property?

Selling, letting or renovating? Find out which property assessments you need.

Arrange access before the visit
How to prepare for your visit

Which areas we need to see depends on the assessments. We'll confirm what you need to make accessible before the visit.

Illustration: rooms, accessible cupboards and outbuildings

Rooms in the property

Rooms, accessible cupboards and outbuildings

Open doors, clear passageways and have the keys ready for any locked rooms.

Illustration: consumer unit, meters and boiler

Building services

Consumer unit, meters and boiler

Clear the area around the consumer unit, meters and heating equipment.

Illustration: loft, cellar and garage

Lofts and lower levels

Loft, cellar and garage

Locate hatches and access points. Let us know beforehand if any areas are difficult to reach.

Illustration: plant room and communal areas

Shared areas

Plant room and communal areas

If the inspection covers these areas, arrange access with the managing agent, caretaker or occupants.

Documents to have ready
Start with what you already have

Gather the documents you have and tell us what's missing.

Illustration: previous assessment reports

Previous assessment reports

Gather the complete reports and any update certificates.

This helps us check what exists and what can be reused.

Illustration: property plans

Property plans

Have any floor plans, known measurements and technical documents ready.

These help us understand the layout and features of the property.

Illustration: invoices for completed works

Invoices for completed works

Find any records for insulation, windows, heating and hot water.

They help document the equipment and improvements, especially for the DPE.

SELLING OR LETTING · WHAT TO CHECK

Are your reports
still valid?

Already have reports? Check how long they remain valid and whether you can reuse them when selling or letting.

Which rules apply to you, and why.

The year of construction is one factor. The address, installations and ownership arrangement also matter.

Home inspection reports: selling versus letting in metropolitan France
InspectionWhen sellingWhen lettingWhen is it required?
Energy Performance Certificate (DPE)Energy performanceGenerally requiredGenerally required

Selling or letting a home, unless a statutory exemption applies. Small flats are still covered.

Lead paint risk · CREPLead in paintIf applicableIf applicable

A home built before 1 January 1949.

AsbestosBuilding materialsIf applicableKeep available on request*

Planning permission issued before 1 July 1997. For lettings, see the note below.

Electrical safetyInstallation safetyIf applicableIf applicable

Electrical installation more than 15 years old. The age of the installation is what matters.

GasInstallation safetyIf applicableIf applicable

Indoor gas installation more than 15 years old. This check applies only where there is a gas installation.

Property risk disclosure · ERPRisks specific to the addressDepends on the addressDepends on the address

A property in a regulated area for risks such as flooding, earthquakes, radon or pollution.

TermitesInsects that damage timberDepends on the areaNot required for the tenancy agreement

Required for sale in an area designated by a prefectural order, regardless of the property’s age.

Carrez floor areaPrivate floor area of the unit being soldPart of a co-owned propertyNot applicable

Sale of a house or flat that forms a co-owned unit of at least 8 m². Cellars, garages and parking spaces are excluded.

Habitable floor area · Boutin lawFloor area stated in the tenancy agreementNot applicableMain residence

The tenancy agreement must state the habitable floor area. The calculation differs from the Carrez measurement.

* Asbestos in rented homes. For a flat with planning permission issued before July 1997, the landlord must make the private-area asbestos file (DAPP) available to the tenant on request. It does not have to be attached to every tenancy agreement. See the rule (official source, opens in a new tab)

DPE exemptions. For example, some detached buildings under 50 m² are exempt. This exemption does not apply to a studio in a block of flats. Understand the exemptions.

Selling: check the dates before you sign.

Gather the reports in the statutory inspection pack (DDT). Some may need renewing, while others can be reused.

Validity periods when selling a home
Inspection or documentValidity periodWhat it means
Energy Performance Certificate (DPE)10 years

For reports issued on or after 1 July 2021. Older DPE certificates have expired.

The official rule (official source, opens in a new tab)
Lead paint risk · CREPUnder 1 year

Applies when lead reaches the statutory threshold. If no lead is found, or levels are below 1 mg/cm², the report does not expire.

The official rule (official source, opens in a new tab)
Electrical safetyUnder 3 years

Check at the time of sale. Some certificates of compliance can take the place of the inspection report.

The official rule (official source, opens in a new tab)
GasUnder 3 years

Check at the time of sale. A recent certificate of compliance can replace the report if it meets the requirements.

The official rule (official source, opens in a new tab)
Property risk disclosure · ERPUnder 6 months

Update it if risks or information change before signing.

The official rule (official source, opens in a new tab)
TermitesUp to 6 months

Renew an expired report if the property still requires one.

The official rule (official source, opens in a new tab)
AsbestosDepends on the report

Renew reports from before 1 April 2013 before selling. Later reports have no automatic expiry, but any follow-up recommendations still apply. Building work may warrant a new survey.

The official rule (official source, opens in a new tab)
Carrez floor areaAs long as the floor area stays the same

Check it after work that changes the floor area. The measurement must match the property being sold.

The official rule (official source, opens in a new tab)
Private wastewater system (official source, opens in a new tab)Under 3 years

The local public wastewater service (SPANC) checks the private system. Its report is separate from the home inspection reports.

The official rule (official source, opens in a new tab)
Energy audit (official source, opens in a new tab)5 years

Required for the sale of a house or a building in single ownership rated E, F or G in metropolitan France. It is supplied alongside the DPE.

The official rule (official source, opens in a new tab)

Letting: get your reports ready for the tenancy agreement.

Gas, electrical and lead reports have different validity periods for lettings and sales.

Validity periods when letting a main residence
Inspection or documentValidity periodWhat it means
Energy Performance Certificate (DPE)10 years

For reports issued on or after 1 July 2021. The property must also meet the minimum energy rating for letting.

The official rule (official source, opens in a new tab)
Lead paint risk · CREPUnder 6 years

Applies when lead reaches the statutory threshold. If no lead is found, or levels are below 1 mg/cm², the report does not expire.

The official rule (official source, opens in a new tab)
Electrical safetyUnder 6 years

At the date the tenancy agreement is signed. You can reuse a report prepared for sale if it is still within this period.

The official rule (official source, opens in a new tab)
GasUnder 6 years

At the date the tenancy agreement is signed. A sale report can be reused if it is still within this period.

The official rule (official source, opens in a new tab)
Property risk disclosure · ERPUnder 6 months

Provide it at the first viewing and update it if needed before signing.

The official rule (official source, opens in a new tab)
Habitable floor area · Boutin lawAs long as the floor area stays the same

Recalculate if work changes the habitable floor area stated in the tenancy agreement.

The official rule (official source, opens in a new tab)
AsbestosFollow-up depends on the file

An asbestos report is not routinely attached to the tenancy agreement. If the flat is covered by the rules, the private-area asbestos file must remain available to the tenant.

The official rule (official source, opens in a new tab)

A valid report is only one requirement for letting. In metropolitan France, G-rated homes have failed the minimum energy standard since 2025 for new, renewed or extended tenancies. F-rated homes follow in 2028 and E-rated homes in 2034. Understand the DPE rules.

Other documentsAudit, wastewater, noise, dry rot, co-ownership and land

Audit, wastewater and noise

Selling an E-, F- or G-rated house or building in single ownership in metropolitan France requires an energy audit valid for 5 years. A private wastewater system requires a SPANC report under 3 years old. An airport noise disclosure applies to sales and lettings in designated areas.

Dry rot: disclosing the risk

In an area designated by official order, sellers must tell buyers about the risk of dry rot. The disclosure requirement does not always entail a dry rot inspection with a nationally prescribed validity period.

Seller’s disclosure (official source, opens in a new tab)

Buildings: the DTG and DPE serve different purposes

The building condition assessment (DTG) reviews the building’s condition and anticipated works. Its 10-year outlook is a planning horizon. The building-wide DPE has its own rules, explained below.

Building condition assessment (DTG) (official source, opens in a new tab)

Land: a specific ground investigation

Selling certain building plots in areas with medium or high exposure to clay shrinkage and swelling requires a preliminary geotechnical study. It remains valid for 30 years if the ground has not been altered.

French Construction Code · R.132-6 (opens in a new tab)

Key dates
What to check

Sales, lettings and existing reports: changes that may affect your plans in mainland France.

2026Since 1 January
Co-owned buildings · Building-wide DPE

Small co-owned buildings are now covered too

In mainland France, the requirement for a building-wide DPE now applies to co-owned properties with up to 50 units, where planning permission for the multi-unit residential building was applied for before 1 January 2013. It covers the building as a whole and does not replace the DPE for your flat.

Ask the managing agent whether the building-wide DPE is available. It is valid for 10 years. A building rated A, B or C after 1 July 2021 is exempt from renewal.

French public services — official source, opens in a new tab
2026Since 1 January
DPE · Electricity

Check your rating before booking a new DPE

The electricity conversion factor changed from 2.3 to 1.9. If the rating improves, a valid DPE may qualify for a free update certificate from ADEME without a new visit.

Check your report with ADEME before commissioning a new assessment.

French public services — official source, opens in a new tab
2025Since 1 January
Selling · Energy audit

E-rated houses now need an audit too

In mainland France, the sale of an E-, F- or G-rated house or residential building under single ownership requires an energy audit in addition to the DPE. Give it to prospective buyers at the first viewing.

Arrange the audit before viewings. This requirement does not apply to all individual flats in co-owned buildings.

French Ministry for the Ecological Transition — official source, opens in a new tab
2025Next milestone: 2028
Letting · Minimum energy standards

A valid report alone does not establish that a home can be let

In mainland France, G-rated homes have fallen below the minimum energy standard for tenancies signed, renewed or automatically extended since 2025. F-rated homes follow in 2028 and E-rated homes in 2034.

Check the property's rating and the tenancy's next renewal date before planning to let it.

French public services — official source, opens in a new tab
2024Since 1 July
DPE · Small homes

Up to 40 m²? Check for an update certificate

DPE thresholds were adjusted for homes with a reference floor area of 40 m² or less. An update certificate showing the new rating is available from ADEME for qualifying reports.

Keep the original report with the certificate. Floor area alone does not establish the new rating.

French public services — official source, opens in a new tab

A professional
you can verify.

Check our certifications and insurance certificate before your appointment.

Let’s talk about your property.

Selling, letting or renovating?
We’ll help you work out which inspections you need.

Get a quote in 2 minutes 06 80 35 31 84 Chat on WhatsApp