Drilling, lifting flooring, opening a partition or demolishing a building: what you need to check depends on the work and which materials it will disturb.
The party commissioning the works must arrange an asbestos survey covering the work area. Older buildings are particularly likely to be affected, and exemptions are limited.
Identify the materials the work could affect, based on the detailed work schedule.
Before demolition
Arrange a dedicated survey for the building and area to be demolished. A sale assessment is separate.
A clear work scope helps define the survey
Documents to provide
The address, plans, building date, affected materials, detailed work schedule and expected dates help define the scope before the visit.
Existing reports
The building asbestos file (DTA), asbestos file for private areas (DAPP), earlier assessments and laboratory results may be useful. Check that they cover the proposed works before relying on them.